US Public Sector
State Fee Calculators
Tap any agency to run a live fee calculation. Florida DMS lives on its own home tab.
- Curve
Washington
Office of Financial Management (OFM)
Schedules A/B/C by building type, with separate Design-Bid-Build and GC/CM curves. Effective July 1, 2025.
WA OFM 2025-27 Budget Instructions, Chapter 9 — A&E Fee Guidelines.
- Calc
California
Department of General Services (DGS) / RESD
Negotiated per Public Contract Code 10510. RESD historically references Mead-Hunt curves and AIA Document B102 schedules.
CA DGS Real Estate Services Division — Project Management Branch (PMB).
- Calc
Texas
Texas Facilities Commission (TFC)
Sliding-scale design fee curve negotiated per Texas Government Code §2254. UT/A&M systems publish their own schedules.
TFC Design & Construction; UT System OFPC.
- Calc
New York
Office of General Services (OGS) — Design & Construction
Negotiated lump-sum or % of construction. SUCF publishes its own fee curves by building type.
NY OGS Design Procedures Manual; SUCF Consultant Procedures.
- Calc
Georgia
Georgia State Financing & Investment Commission (GSFIC)
GSFIC publishes a basic-services fee curve in its Construction Manual; tracks AIA historical norms.
GSFIC Construction Division Manual.
- Calc
North Carolina
State Construction Office (SCO)
Curves substantially similar to federal/DoD curves with three complexity classes.
NC State Construction Manual, Section 300.
- Calc
South Carolina
Office of State Engineer (OSE)
OSE Manual for Planning & Execution of State Permanent Improvements (Manual 200).
SC OSE Manual 200.
- Calc
Alabama
Building Commission
Negotiated under Code of Alabama §41-9-141. Three-tier complexity table is the standard reference.
Alabama Building Commission policy.
- Calc
Tennessee
STREAM (TN Real Estate Asset Mgmt.)
STREAM Designers' Manual specifies basic-services fees by complexity class.
TN STREAM Designers' Manual.
- Calc
Virginia
Bureau of Capital Outlay Management (DEB/DGS)
Construction & Professional Services Manual (CPSM) basic-services curve plus add-services schedule.
VA DGS-DEB CPSM.
- Calc
Oregon
Department of Administrative Services (DAS)
Negotiated per ORS 279C.110 QBS. References AIA historical curves & WA Ch.9 as benchmarks.
OR DAS Capital Construction Procedures.
- Calc
Colorado
State Buildings Program (DPA)
State Buildings Program Manual sets target A/E fee % based on construction cost and complexity.
CO State Buildings Programs Policy Manual.
- Calc
Federal
U.S. General Services Administration (GSA — PBS)
Cost-based negotiation under Brooks Act with PMG fee curves; A/E fees historically 6–8% on large federal courthouses & offices.
GSA P-100; PBS Project Management Guide.
- Calc
Federal
U.S. Army Corps of Engineers (USACE)
Cost-based negotiation per FAR Part 36 / DFARS; published fee bands tied to complexity class (I–IV).
USACE EP 715-1-7 (A-E Contracting).
- Calc
Federal
Department of Veterans Affairs (VA-CFM)
CFM Major Construction A/E fees follow Brooks-Act negotiation; medical centers draw the highest-complexity curves.
VA Office of Construction & Facilities Management.
Estimates only. Always verify against the current publication of each agency.